【POJ】1287 - Networking(最小生成树(克鲁斯塔尔),水)
2016-01-13 12:29
405 查看
Networking
Description
You are assigned to design network connections between certain points in a wide area. You are given a set of points in the area, and a set of possible routes for the cables that may connect pairs of points. For each possible route between two points, you are
given the length of the cable that is needed to connect the points over that route. Note that there may exist many possible routes between two given points. It is assumed that the given possible routes connect (directly or indirectly) each two points in the
area.
Your task is to design the network for the area, so that there is a connection (direct or indirect) between every two points (i.e., all the points are interconnected, but not necessarily by a direct cable), and that the total length of the used cable is minimal.
Input
The input file consists of a number of data sets. Each data set defines one required network. The first line of the set contains two integers: the first defines the number P of the given points, and the second the number R of given routes between the points.
The following R lines define the given routes between the points, each giving three integer numbers: the first two numbers identify the points, and the third gives the length of the route. The numbers are separated with white spaces. A data set giving only
one number P=0 denotes the end of the input. The data sets are separated with an empty line.
The maximal number of points is 50. The maximal length of a given route is 100. The number of possible routes is unlimited. The nodes are identified with integers between 1 and P (inclusive). The routes between two points i and j may be given as i j or as j
i.
Output
For each data set, print one number on a separate line that gives the total length of the cable used for the entire designed network.
Sample Input
Sample Output
Source
Southeastern Europe 2002
用克鲁斯塔尔算,不难的最小生成树的题。
代码如下:
Time Limit: 1000MS | Memory Limit: 10000K | |
Total Submissions: 7698 | Accepted: 4216 |
You are assigned to design network connections between certain points in a wide area. You are given a set of points in the area, and a set of possible routes for the cables that may connect pairs of points. For each possible route between two points, you are
given the length of the cable that is needed to connect the points over that route. Note that there may exist many possible routes between two given points. It is assumed that the given possible routes connect (directly or indirectly) each two points in the
area.
Your task is to design the network for the area, so that there is a connection (direct or indirect) between every two points (i.e., all the points are interconnected, but not necessarily by a direct cable), and that the total length of the used cable is minimal.
Input
The input file consists of a number of data sets. Each data set defines one required network. The first line of the set contains two integers: the first defines the number P of the given points, and the second the number R of given routes between the points.
The following R lines define the given routes between the points, each giving three integer numbers: the first two numbers identify the points, and the third gives the length of the route. The numbers are separated with white spaces. A data set giving only
one number P=0 denotes the end of the input. The data sets are separated with an empty line.
The maximal number of points is 50. The maximal length of a given route is 100. The number of possible routes is unlimited. The nodes are identified with integers between 1 and P (inclusive). The routes between two points i and j may be given as i j or as j
i.
Output
For each data set, print one number on a separate line that gives the total length of the cable used for the entire designed network.
Sample Input
1 0 2 3 1 2 37 2 1 17 1 2 68 3 7 1 2 19 2 3 11 3 1 7 1 3 5 2 3 89 3 1 91 1 2 32 5 7 1 2 5 2 3 7 2 4 8 4 5 11 3 5 10 1 5 6 4 2 12 0
Sample Output
0 17 16 26
Source
Southeastern Europe 2002
用克鲁斯塔尔算,不难的最小生成树的题。
代码如下:
#include <stdio.h> #include <algorithm> using namespace std; struct node { int st,end,cost; }a[2500]; //记录每一条路 int pp[55]; bool cmp(node a,node b) //按花销从小到大排序 { return a.cost<b.cost; } int find(int x) { int r=x; while (r!=pp[r]) r=pp[r]; int j=x; int t; while (pp[j]!=r) { t=pp[j]; pp[j]=r; j=t; } return r; } int join(int x,int y) { int fx,fy; fx=find(x); fy=find(y); if (fx!=fy) { pp[fx]=fy; return 1; //不一棵树返回1 } return 0; } int main() { int p,r; //点,路线数 int ans; int num; //完成连接的数量,等于p-1时终止 while (~scanf ("%d",&p) && p) { scanf ("%d",&r); //首先初始化 for (int i=1;i<=p;i++) { pp[i]=i; } ans=0; num=0; //输入 for (int i=0;i<r;i++) { scanf ("%d %d %d",&a[i].st,&a[i].end,&a[i].cost); } if (p==1) { printf ("0\n"); continue; } sort (a,a+r,cmp); //花费从小到大排序 for (int i=0;i<r;i++) { if (join(a[i].st,a[i].end)) { ans+=a[i].cost; num++; } if (num==p-1) break; } printf ("%d\n",ans); } return 0; }
相关文章推荐
- 在linux下编译安装python3.5.1问题解决
- C标准库,系统调用,系统接口API,内核函数
- 显示cell的分割线的个数
- Sqlite的基本操作
- nsarray 和nsmuablearray的相互转换
- 利用meliae来监控python进程的内存占用情况
- 安卓动画开始,暂停和停止
- 论注释文档的重要性
- C#源代码—在文本框中随意输入一个日期,单机“确定”按钮时显示这一天是星期几?
- 快播案之我见
- 【POJ】1611 - The Suspects(并查集)
- 无法打开源文件 d3dx9tex.h
- Android-动态注册广播和注销广播
- android启动延迟动画
- 《从Paxos到ZooKeeper》读书笔记--两阶段提交 2PC
- Cocoapod快速使用
- Redis操作命令总结
- iOS 编程中 UI 部分UITableView基础知识
- Linux 分区和目录解析
- Android编程设置TextView颜色setTextColor用法实例