您的位置:首页 > 其它

POJ 1287 Networking(最小生成树)

2014-10-23 10:25 351 查看
题意 给你n个点 m条边 求最小生成树的权

这是最裸的最小生成树了

#include<cstdio>
#include<cstring>
#include<algorithm>
using namespace std;
const int N = 55, M = 3000;
int par
, n, m, ans;
struct edge{int u, v, w;} e[M];
bool cmp(edge a, edge b){return a.w < b.w;}

int Find(int x)
{
    int r = x, tmp;
    while(par[r] >= 0) r = par[r];
    while(x != r)
    {
        tmp = par[x];
        par[x] = r;
        x = tmp;
    }
    return r;
}

void Union (int u, int v)
{
    int ru = Find(u), rv = Find(v), tmp = par[ru] + par[rv];
    if(par[ru] < par[rv])
        par[rv] = ru, par[ru] = tmp;
    else
        par[ru] = rv, par[rv] = tmp;
}

void kruskal()
{
    memset(par, -1, sizeof(par));
    int cnt = 0;
    for(int i = 1; i <= m; ++i)
    {
        int u = e[i].u, v = e[i].v;
        if(Find(u) != Find(v))
        {
            ++cnt;
            ans += e[i].w;
            Union(u, v);
        }
        if(cnt >= n - 1) break;
    }
}

int main()
{
    int u, v, w;
    while(scanf("%d", &n), n)
    {
        scanf("%d", &m);
        for(int i = 1; i <= m; ++i)
        {
            scanf("%d%d%d", &u, &v, &w);
            e[i].u = u, e[i].v = v, e[i].w = w;
        }
        sort(e + 1, e + m + 1, cmp);
        ans = 0;
        kruskal();
        printf("%d\n", ans);
    }
    return 0;
}


Networking

Time Limit: 2 Seconds Memory Limit: 65536 KB

You are assigned to design network connections between certain points in a wide area. You are given a set of points in the area, and a set of possible routes for the cables that may connect
pairs of points. For each possible route between two points, you are given the length of the cable that is needed to connect the points over that route. Note that there may exist many possible routes between two given points. It is assumed that the given possible
routes connect (directly or indirectly) each two points in the area.

Your task is to design the network for the area, so that there is a connection (direct or indirect) between every two points (i.e., all the points are interconnected, but not necessarily by a direct cable), and that the total length of the used cable is minimal.

Input
The input file consists of a number of data sets. Each data set defines one required network. The first line of the set contains two integers: the first defines the number P of the given
points, and the second the number R of given routes between the points. The following R lines define the given routes between the points, each giving three integer numbers: the first two numbers identify the points, and the third gives the length of the route.
The numbers are separated with white spaces. A data set giving only one number P=0 denotes the end of the input. The data sets are separated with an empty line.

The maximal number of points is 50. The maximal length of a given route is 100. The number of possible routes is unlimited. The nodes are identified with integers between 1 and P (inclusive). The routes between two points i and j may be given as i j or as j
i.

Output
For each data set, print one number on a separate line that gives the total length of the cable used for the entire designed network.

Sample Input
1 0

2 3

1 2 37

2 1 17

1 2 68
3 7

1 2 19

2 3 11

3 1 7

1 3 5

2 3 89

3 1 91

1 2 32
5 7

1 2 5

2 3 7

2 4 8

4 5 11

3 5 10

1 5 6

4 2 12
0

Sample Output
0

17

16

26
内容来自用户分享和网络整理,不保证内容的准确性,如有侵权内容,可联系管理员处理 点击这里给我发消息
标签: