Jaw crusher should be installed above the concrete foundation,and plus skids or rubber to reduce vibration when working.

Jaw crusher's (jaw crusher) operation: the correct operation of the crusher is one of the important factors that guarantee the crusher works properly, improper operation or negligence in the operation are often caused equipment and personal accidents. Correct operation is to follow the rules strictly.

The preparatory work Before starting : careful examination before starting the crusher, the check contents are: crusher tooth plate wear situation, adjust ore discharging mouth size, whether the ore crushing cavity having ore; if large block ores exist, we must remove them,; whether the connection screws loose; whether the pulley Flywheel protection cover is intact; whether the tightness of the triangle belt and trolley spring are suitable ;whether the lubrication system is intact; whether the electrical equipment and signal system are normal or not.

Handling Precautions of jaw crusher (jaw crusher):
1, After
starting, if the crusher makes unusual beat, we should stop automatically turn,
and restart after identifying and eliminating the ills .
2. When starting,
Crusher must no-load , when the automatically turn is normal, we can start the
ore-discharging equipment , the ore be fed into should be gradually increased
until the load is full.
3. Ore discharging Should be uniform , ores are not
allowed to be packed with the crushing chamber; the maximum mine size allowed
should not be larger than 0.85 times of the ore discharging mouth size; while
feeding ore, we should ban the anti-mine iron and other non-HSBC crushed
materials into the crusher; once we found these non-broken materials go through
the port of discharge, we should immediately notify the belt transporter in time
to prevent serious equipment accidents of the next crusher , such as the impact crusher
and hammer crusher.

In the operation process, we often have to pay attention to the situation of
lump ores stuck to the mine mouth, sometimes use an iron hook flip or
application-specific tools when operating, but not by hand to avoid an accident.
During operation ,if the ore feeding are too many to choke the crushing chamber,
do not stop the crusher ,but should stop ore-feeding, we should start the ore
feeding machine after dealing with the ores in the crushing cavity. during
working, the operator should conduct check regularly, according to to see, hear,
touch and other methods to observe the various components situations of the
crusher position and bearing temperature, the bearing temperature must not
exceed 60 ° C, we should not immediately stop when the bearing temperature is
too high, instead,we should take plus large amount of oil, forced ventilation,
water-cooled these methods to reduce the temperature.