What type of activities we perform in IMPLEMENTATION project? Will we start from modeling stage or interact with R/3?
Responsibilities of an implementation project
For ex, Lets say If its a fresh implementation of BI or for that matter you are implementing SAP.
First and foremost will be your requirements gathering from the client. Depending upon the requirements you will creat a business blueprint of the project which is the entire process from the start to the end of an implementation.
After the blue print phase sign off we start off with the realization phase where the actual development happens. In our example after installing the necessary softwares, patches for BI we need to discuss with the end users who are going to use the system for inputs like how they want a report to look like and what are the Key Performance Indicators(KPI) for the reports etc., basically its a question and answer session with the business users.
After collecting those informations the development happens in the development servers.
After the development comes to an end the same objects are tested in quality servers for any bugs, errors etc., When all the tests are done we move all the objects to the production environment and test it again whether everything works fine.
The Go-Live of the project happens where the actually postings happen from the users and reports are generated based on those inputs which will be available as an analytical report for the management to take decisions.
The responsibilites vary depending on the requirement. Initially the business analyst will interact with the end users/managers etc., then on the requirements the software consultants do the development, testers do the testing and finally the go-live happens.
BW Data Architect Description:
The BW Data Architect is responsible for the overall data design of the BW project. This includes the design of the:
BW InfoCubes (Basic Cubes, Multi-cubes, Remote cubes, and Aggregates) » BW ODS Objects » BW Datamarts » Logical Models » BW Process Models » BW Enterprise Models
The BW Data Architect plays a critical role in the BW project and is the link between the end user's business requirements and the data architecture solution that will satisfy these requirements. All other activities in the BW project are contingent upon the data design being sound and flexible enough to satisfy evolving business requirements.
Time Commitment
– the time which must be committed to this Role to ensure the project requirements are met Project Complexity Time Commitment Low If the BW project utilizes standard BW content and InfoCubes, this role can be satisfied by the BW Application Consultant.
Medium
If the BW project requires enhancements to the standard BW content and InfoCubes and/or requires the integration of non-SAP data, this role may require a committed resource.
High
If the BW project requires significant modification and enhancement to standard BW content and InfoCubes, it is highly recommended that an experienced resource be committed full-time to the project.
Key Attributes
The BW Data Architect must have:
An understanding of the BW data architecture » An understanding of multidimensional modeling » An understanding of the differences between operational systems data modeling and data warehouse data modeling » An understanding of the end user's data » An understanding of the integration points of the data (e.g., customer number, invoice number) » Excellent troubleshooting and analytical skills » Excellent communication skills » Technical competency in data modeling » Multi-language skills, if an international implementation » Working knowledge of the BW and R/3 application(s) » Experience with Data Modeling application software (i.e., ERWIN, Oracle Designer, S-Designer, etc.)
Key Tasks
The BW Data Architect is responsible for capturing the business requirements for the BW project. This effort includes:
Planning the business requirements gathering sessions and process » Coordinating all business requirements gathering efforts with the BW Project Manager » Facilitating the business requirements gathering sessions » Capturing the information and producing the deliverables from the business requirements gathering sessions » Understanding and documenting business definitions of data » Developing the data model » Ensuring integration of data from both SAP and non-SAP sources » Fielding questions concerning the data content, definition and structure
This role should also address other critical data design issues such as:
Granularity of data and the potential for multiple levels of granularity » Use of degenerate dimensions » InfoCube partitioning » Need for aggregation at multiple levels » Need for storing derived BW data » Ensuring overall integrity of all BW Models » Providing Data Administration development standards for business requirements analysis and BW enterprise modeling » Provide strategic planning for data management » Impact analysis of data change requirements As stated above, the BW Data Architect is responsible for the overall data design of the BW project.
This includes the design of the:
BW InfoCubes (Basic Cubes, Multi-cubes, Remote cubes, and Aggregates) » BW ODS Objects » BW Datamarts » Logical Models » BW Process Models » BW Enterprise Models
BW Project Implementation and Rollout
Global IDs uses a modified version of the ASAP methodology to ensure a robust BW environment is implemented, tested, and delivered. The project milestones include the following:
Blueprinting
Realization
Roll Out
Post-Implementation Support
Organizational Change Management
BW Maintenance
*Phase 1: Upgrade Project Preparation -*
The purpose of this phase is to provide initial planning and preparation for your R/3 upgrade project. Although each upgrade project has unique objectives, scope and priorities, the steps in Phase 1 help identify and plan the primary topics that must be considered.
*Phase 2: Business Blueprint -*
The purpose of this phase is to establish a common understanding in your company about how the new R/3 release will handle your current business processes after the R/3 upgrade.
*Phase 3: Realization of DEV and QAS -*
The purpose of this phase is to perform the upgrade of all non-production R/3 Systems, which normally include development (DEV) and quality assurance
(QAS) systems, and to ensure the quality of this upgrade process by comprehensive testing. You need to upgrade your DEV and QAS systems before performing the upgrade for your production system (PRD). Furthermore, you will develop your end user documentation and training in this phase.
*Phase 4: Realization of Production -*
The purpose of this phase is to complete the final preparation for the upgrade of the production R/3 System, and end user training, if necessary. On the successful completion of this phase, you are ready to run your business in your upgraded production R/3 System.
*Phase 5: Go Live and Support -*
The purpose of this phase is the transition from your previous R/3 System to a newly upgraded and improved R/3 System. Be aware that you must set up an ongoing support organization to service your R/3 users, both during the first few days of your upgraded production operations, and on an ongoing basis.
Responsibilities of an implementation project
For ex, Lets say If its a fresh implementation of BI or for that matter you are implementing SAP.
First and foremost will be your requirements gathering from the client. Depending upon the requirements you will creat a business blueprint of the project which is the entire process from the start to the end of an implementation.
After the blue print phase sign off we start off with the realization phase where the actual development happens. In our example after installing the necessary softwares, patches for BI we need to discuss with the end users who are going to use the system for inputs like how they want a report to look like and what are the Key Performance Indicators(KPI) for the reports etc., basically its a question and answer session with the business users.
After collecting those informations the development happens in the development servers.
After the development comes to an end the same objects are tested in quality servers for any bugs, errors etc., When all the tests are done we move all the objects to the production environment and test it again whether everything works fine.
The Go-Live of the project happens where the actually postings happen from the users and reports are generated based on those inputs which will be available as an analytical report for the management to take decisions.
The responsibilites vary depending on the requirement. Initially the business analyst will interact with the end users/managers etc., then on the requirements the software consultants do the development, testers do the testing and finally the go-live happens.
BW Data Architect Description:
The BW Data Architect is responsible for the overall data design of the BW project. This includes the design of the:
BW InfoCubes (Basic Cubes, Multi-cubes, Remote cubes, and Aggregates) » BW ODS Objects » BW Datamarts » Logical Models » BW Process Models » BW Enterprise Models
The BW Data Architect plays a critical role in the BW project and is the link between the end user's business requirements and the data architecture solution that will satisfy these requirements. All other activities in the BW project are contingent upon the data design being sound and flexible enough to satisfy evolving business requirements.
Time Commitment
– the time which must be committed to this Role to ensure the project requirements are met Project Complexity Time Commitment Low If the BW project utilizes standard BW content and InfoCubes, this role can be satisfied by the BW Application Consultant.
Medium
If the BW project requires enhancements to the standard BW content and InfoCubes and/or requires the integration of non-SAP data, this role may require a committed resource.
High
If the BW project requires significant modification and enhancement to standard BW content and InfoCubes, it is highly recommended that an experienced resource be committed full-time to the project.
Key Attributes
The BW Data Architect must have:
An understanding of the BW data architecture » An understanding of multidimensional modeling » An understanding of the differences between operational systems data modeling and data warehouse data modeling » An understanding of the end user's data » An understanding of the integration points of the data (e.g., customer number, invoice number) » Excellent troubleshooting and analytical skills » Excellent communication skills » Technical competency in data modeling » Multi-language skills, if an international implementation » Working knowledge of the BW and R/3 application(s) » Experience with Data Modeling application software (i.e., ERWIN, Oracle Designer, S-Designer, etc.)
Key Tasks
The BW Data Architect is responsible for capturing the business requirements for the BW project. This effort includes:
Planning the business requirements gathering sessions and process » Coordinating all business requirements gathering efforts with the BW Project Manager » Facilitating the business requirements gathering sessions » Capturing the information and producing the deliverables from the business requirements gathering sessions » Understanding and documenting business definitions of data » Developing the data model » Ensuring integration of data from both SAP and non-SAP sources » Fielding questions concerning the data content, definition and structure
This role should also address other critical data design issues such as:
Granularity of data and the potential for multiple levels of granularity » Use of degenerate dimensions » InfoCube partitioning » Need for aggregation at multiple levels » Need for storing derived BW data » Ensuring overall integrity of all BW Models » Providing Data Administration development standards for business requirements analysis and BW enterprise modeling » Provide strategic planning for data management » Impact analysis of data change requirements As stated above, the BW Data Architect is responsible for the overall data design of the BW project.
This includes the design of the:
BW InfoCubes (Basic Cubes, Multi-cubes, Remote cubes, and Aggregates) » BW ODS Objects » BW Datamarts » Logical Models » BW Process Models » BW Enterprise Models
BW Project Implementation and Rollout
Global IDs uses a modified version of the ASAP methodology to ensure a robust BW environment is implemented, tested, and delivered. The project milestones include the following:
Blueprinting
Realization
Roll Out
Post-Implementation Support
Organizational Change Management
BW Maintenance
*Phase 1: Upgrade Project Preparation -*
The purpose of this phase is to provide initial planning and preparation for your R/3 upgrade project. Although each upgrade project has unique objectives, scope and priorities, the steps in Phase 1 help identify and plan the primary topics that must be considered.
*Phase 2: Business Blueprint -*
The purpose of this phase is to establish a common understanding in your company about how the new R/3 release will handle your current business processes after the R/3 upgrade.
*Phase 3: Realization of DEV and QAS -*
The purpose of this phase is to perform the upgrade of all non-production R/3 Systems, which normally include development (DEV) and quality assurance
(QAS) systems, and to ensure the quality of this upgrade process by comprehensive testing. You need to upgrade your DEV and QAS systems before performing the upgrade for your production system (PRD). Furthermore, you will develop your end user documentation and training in this phase.
*Phase 4: Realization of Production -*
The purpose of this phase is to complete the final preparation for the upgrade of the production R/3 System, and end user training, if necessary. On the successful completion of this phase, you are ready to run your business in your upgraded production R/3 System.
*Phase 5: Go Live and Support -*
The purpose of this phase is the transition from your previous R/3 System to a newly upgraded and improved R/3 System. Be aware that you must set up an ongoing support organization to service your R/3 users, both during the first few days of your upgraded production operations, and on an ongoing basis.
相关文章推荐
- spring.jar是包含有完整发布的单个jar 包,spring.jar中包含除了spring-mock.jar里所包含的内容外其它所有jar包的内容,因为只有在开发环境下才会用到 spring-mock.jar来进行辅助测试,正式应用系统中是用不得这些类的
- 如果我新接一个做到一半的项目,或者需要二次开发的项目我希望了解的内容有哪些?
- IT项目管理需要注意哪些内容
- [转]敏捷项目章程应该包含哪些内容?
- sharepoint 2010 "若要在 Visual Studio 中与 SharePoint 项目进行交互,您的系统用户帐户必须拥有管理员特权。"的解决方法
- myeclipse中项目修改哪些内容需要重新部署(不断补充)
- 企业需要明确ERP系统实施的哪些质量控制要点
- 继承练习 :开发一个系统时 需要对员工进行建模 员工包含3个属性 姓名 工号 工资 功能 work
- 这个证书包含的项目内容有哪些?
- 这是一个用于拦截android实时短信的库,可以进行短信过滤,得到自己想要的内容,可以用于需要自动填写短信验证码的app项目
- 一个成功的BI项目实施需要注意哪些?
- 一个成功的BI项目实施需要注意哪些?
- 一个成功的BI项目实施需要注意哪些?
- 测试用例需要包含哪些内容
- 【系统相关】打开WORD2016就弹出:您正试图运行的函数包含有宏或需要宏语言支持的内容...
- 如何安装整个linux系统中所需要的mp3播放库插件? 可以在安装rpmfusion仓库后直接通过dnf install进行按照就可以了
- 如果网页内容需要支持多语言,你会怎么做?在设计和开发多语言网站时,有哪些问题你必须要考虑?
- ubuntu用qt creator写的程序编译后生成的可执行文件复制到另一个系统中需要哪些文件才能运行
- 解决IIS出现包含空格的项目的文件/路径部分需要用括号括起来的问题
- JavaEE项目改名,需要改哪些文件