SAP MRP Made Easy -[1.5]需求类型的决定过程

2009-06-15 02:10 501 查看
Determination of the Requirements Type
需求类型的决定过程

     


If you have entered a strategy group or an MRP group containing the appropriate strategies in the material master record, you do not have to enter a requirements type in Demand Management. The system determines the valid requirements type with the strategy group from the material master record and proposes this type automatically when creating independent or customer requirements. If the strategy group contains more than one planning strategy, the system proposes the requirements type of the main strategy. If necessary, you can overwrite this proposal using one of the requirements types from the alternative strategies.
如果在物料主数据中你已经输入了一个包含正确策略的策略组或MRP组,你就不需要再在需求管理中输入需求类型了。系统从物料主数据中的策略组中获得有效的需求类型,并在创建独立需求或客户需求时自动建议。如果策略组包含多个计划策略,系统建议使用主策略的需求类型,你也可应使用替代策略来覆盖已建议的策略。
 
The following strategy groups combine two planning strategies:
以下策略组包含两个计划策略:
Strategy 31 策略 31
Allows you to select the Make-to-Order Production (20) or Production by Lot-size (30) strategies by selecting the KE or KL requirements types [strategy 20 (KE) is the default]
允许你选择按单生产(20)或按批量生产(30)策略,需求类型是KE或KL  [策略20(KE)是缺省的]。
 
Strategy 32  策略 32
 
Allows you to select the Production by Lot-size (30) or Make-to-Order Production (20) strategies by selecting the KL or KE requirements types [strategy 30 (KL) is the default]
允许你选择按批量生产(30)或按单生产(20)策略,需求类型是KL或KE  [策略30(KL)是缺省的]。
 
Strategy 33  策略 33
 
Allows you to select the Production by Lot-size (30) or Planning with Final Assembly (40) strategies by selecting the KL or KSV requirements types [strategy 30 (KL) is the default]
允许你选择按批量生产(30)或带最终组装的生产(40)策略,需求类型是KL或KSV [策略30(KL)是缺省的]
 
 
Table of Planning Strategy Assignments
计划策略分配表
 
Strategy
策略
Requirements Type for Independent Requirements
独立需求的需求类型
 Requirements Type for Customer Requirements
客户需求的需求类型
 
10
(Chapter 2)
 
LSF
 
Make-to-stock production
按库存生产
 
KSL
 
Sale from stock without independent requirement reduction
从库存销售,不消耗独立需求
 
11
(Chapter 2)
 
BSF
 
Gross planned independent requirements
毛计划独立需求
 
KSL
 
Sale from stock without independent requirement reduction
从库存销售,不消耗独立需求
20 (Chapter 4
 
 
 
KE
 
Individual sales order without consumption
不作消耗的个别销售订单
 
25
(Chapter 5)
 
 
 
KEK
 
Make-to-order with configurable material
使用可配置物料的按单生产
 
26
(Chapter 5)
 
 
 
KEL
 
Make-to-order for material variants
为变式物料作按单生产
 
30
(Chapter 2)
 
LSF
 
Make-to-stock production
按库存生产
 
KL
 
Sales order manufactured by lot size
按批量的销售订单制造
 
40
(Chapter 2)
 
VSF
 
Planning with final assembly
带最终装配的计划
 
KSV
 
Sales order with consumption
销售订单消耗
 
50
(Chapter 4)
 
VSE
 
Planning without final assembly
无最终装配的计划
 
KEV
 
Make-to-order with consumption
带消耗的按单生产
 
52
(Chapter 2)
 
VSE
 
Planning without final assembly
无最终装配的计划
 
KSVS
 
Make-to-stock with consumption without final assembly
带消耗的对库存生产无最终装配
 
54
(Chapter 5)
 
VSE
 
Planning without final assembly
无最终装配的计划
 
KEKT
 
Make-to-order with consumption of variant
带变式消耗的按单生产
 
55
(Chapter 5)
 
VSE
 
Planning without final assembly
无最终装配的计划
 
KELV
 
Make-to-order variant with consumption
带消耗的变式按单生产
Strategy
策略
Requirements Type for Independent Requirements
独立需求的需求类型
 Requirements Type for Customer Requirements
客户需求的需求类型
 
56
(Chapter 5)
 
VSE
 
Planning without final assembly
无最终装配的计划
 
KEKS
 
Make-to-order with consumption of characteristics planning
带特性计划消耗的按单生产
 
59
(Chapter 3)
 
VSEB
 
Planning; phantom assemblies
计划:虚拟组装  
 
 
 
60
(Chapter 4)
 
VSEV
 
Planning the planning material
计划计划物料
 
KEVV
Individual customer with planning material consumption
带计划物料消耗的个别客户
 
63
(Chapter 2)
 
VSEV
 
Planning the planning material
计划计划物料
 
KSVV
Make-to-stock with consumption of planning material
带计划物料消耗的按库存生产
 
65
(Chapter 5)
 
VSEV
 
Planning the planning material
计划计划物料
 
ELVV
 
Make-to-order variant with planning material
带计划物料的变式按库存生产
 
70
(Chapter 3)
 
VSFB
 
Planning for assemblies
为组装计划
 
 
 
81
(Chapter 6)
 
 
 
KMSE
 
Assembly planned order
计划订单组装
 
82
(Chapter 6)
 
 
 
KMFA
 
Assembly with production order
生产订单组装
 
89
(Chapter 5)
 
VSE
 
Planning for assemblies
为组装计划
 
KMSE
 
Assembly planned order
计划订单组装
 
 
The following planning strategies are used in the Project System (refer to the Project System documentation for more details):
以下计划策略使用在项目系统中(参考项目系统文档可以获得根多的信息):
 
Strategy 21  Similar to 20 with project settlement.
策略21       和20相似,使用项目结算。
Strategy 51  Similar to 50 with project settlement.
策略51       和50相似,使用项目结算。
 
Strategy 61  Similar to 60 with project settlement.
策略61       和60相似,使用项目结算。
Strategy 83  Assembly processing for PS.
策略83       为PS项目系统的组装处理。
 
Strategy 85  Assembly processing for PS.
策略85       为PS项目系统的组装处理。
 
The following planning strategy is used in Service Management (refer to the Service Management documentation for more details):
以下计划策略用在服务管理中(参考服务管理文档获得更多的信息):
 
Strategy 84   Assembly processing for SM
策略84        为SM服务管理的组装处理
The following planning strategy is used in PP-PI [(Production Planning for Process Industy) refer to the PP-PI documentation for more details]:
以下计划策略用在流程行业的生产计划[(Production planning for Process Industy)参考PP-PI文档会获得更多的信息]:
Strategy 86 Assembly processing for PP-PI
策略86        为PP-PI的组装处理