Change the base unit of measure(更改度量单位)
2007-04-07 11:54
369 查看
根据SAP的提示信息,更改度量单位需要满足:1、该物料没有当期和前期库存;2、不存在该物料的采购申请、采购订单、计划协议。然而事实上远没有这么简单。
根据SAP Note: 138767,更改物料度量单位时,系统会进行以下检测:
The base unit must not be defined as an alternative unit of measure for the material
No International Article Number must be assigned to the base unit
No proportion/product units must be defined for the material
No configurable material must be assigned
The material must not be used as a configurable material
Stock must neither exist for the previous period nor for the current period
No physical inventory must be active
No reservations or dependent requirements must exist for which the deletion indicator is not set
No planned orders must exist
No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
No WM transfer requirements, no WM quants or no WM posting change notices must exist
The material must not be a bill of material
The material must not be contained in a bill of material
The material must not be used as a production resource/tool
The material must not be used in task lists
No standard cost estimate must exist for the current or future period
No production orders must exist
No planned independent requirements must exist
No run schedule headers must exist
If the base unit has dimensions, no serial number profile must be assigned
No sales and distribution documents must exist which have status Not processed or Partially processed.
如果存在前期库存,根据SAP Note: 30656的提示,需:
Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.
Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).
这是 SAPFans 给的一个详细步骤(带批次管理):
wait until last day of the period
post GI using 201 (but I not sure why SAP says used 561)
period close and open new period
uncheck the Batch Management indicator in material
reverse the GI with 202
delete and archive
来源:http://www.mexp.net/wordpress/?p=51
根据SAP Note: 138767,更改物料度量单位时,系统会进行以下检测:
The base unit must not be defined as an alternative unit of measure for the material
No International Article Number must be assigned to the base unit
No proportion/product units must be defined for the material
No configurable material must be assigned
The material must not be used as a configurable material
Stock must neither exist for the previous period nor for the current period
No physical inventory must be active
No reservations or dependent requirements must exist for which the deletion indicator is not set
No planned orders must exist
No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
No WM transfer requirements, no WM quants or no WM posting change notices must exist
The material must not be a bill of material
The material must not be contained in a bill of material
The material must not be used as a production resource/tool
The material must not be used in task lists
No standard cost estimate must exist for the current or future period
No production orders must exist
No planned independent requirements must exist
No run schedule headers must exist
If the base unit has dimensions, no serial number profile must be assigned
No sales and distribution documents must exist which have status Not processed or Partially processed.
如果存在前期库存,根据SAP Note: 30656的提示,需:
Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.
Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).
这是 SAPFans 给的一个详细步骤(带批次管理):
wait until last day of the period
post GI using 201 (but I not sure why SAP says used 561)
period close and open new period
uncheck the Batch Management indicator in material
reverse the GI with 202
delete and archive
来源:http://www.mexp.net/wordpress/?p=51
相关文章推荐
- Change the base unit of measure(更改度量单位)
- Change the base unit of measure(更改度量单位)
- Change the base unit of measure(更改度量单位)
- Change the base unit of measure(更改度量单位)
- How can I protect derived classes from breaking when I change the internal parts of the base class?
- 更改ValidatorCalloutExtender的图标(Change the icon of ValidatorCalloutExtender)
- 2.4.4.1 度量单位(UNITS OF MEASURE)
- Change the content of the file
- In Delphi XE2 FireMonkey - How do i change the color of a button after pressing it
- change the scrollbar colors of TWebBrowser?
- 【skill】Change the persion of your body
- BASH Shell change the color of my shell prompt under Linux or UNIX
- How to Change the language of a site template
- Inheritance is the base class of evil (Sean Parent)
- Compilation unit name must end with .java, or one of the registered Java-like extensions (a error分析
- Xcode4 布置Git环境Your working copy is out of date. Try pulling from the remote to get the latest change
- AxonFramework工作单元,The Unit of Work
- Change Log of Joomsport: Overwrite the CSS
- The vim syntax of systemd unit file
- CocoaPods did not set the base configuration of your project 问题解决方案